I wanted to post up a few of the nick-nacks that have been coming in. For those of you that are following along this build, I know you will find it interesting.
The ring plate adaptor. Shawn went with 4140 steel, the added expense was minimal and it gave us plenty of extra strength. Basically keeping with the philosophy of 'why half-*** what you can overdo!" You can see it in this picture along with the phenolic spacer that he made for the throw out bearing. The new clutch is a good deal smaller than the original so the spacer was needed. The use of thermal inhibiting material should help separate the throwout bearing from the transmission heat.
Here is the heart of the beast with focus on the new motor mount we built to accommodate the fuel pump and related hardware.
The ATI damper and Accufab tensioner are among a few item you can see from here.
My helpful daughter, and self appointed hand model for this photo, holding the pulley for the new Whipple. This pulley is 4.5" and should produce 30-35lbs of boost.
We had to bump the ability to cool the charged air so we are introducing a second intercooler. When installed, I will challenge you to find these. Here is a picture with the two new Garrett 1000hp intercoolers next to the old stock unit.